Tuesday, September 28, 2010

Why Are There No Free Jesse Jane Clips

BELGRANO NEW APPROACHES TO LOAD Peña

is being held on rail transport to be used in the renovation of roads in various Belgrano Cargas Railroad branches - SOE. The renovation work will be in Santiago del Estero, Chaco and Santa Fe, totaling about 157 kilometers of new track.


This operation recorded as they pass through the station San Justo (Santa Fe) takes a linear rail 3600 meters as 1800 meters of track are distributed at 40 tracks per flat.

Rails, arrived at the port of Rosario, are of VIGNOLE, with profile 54 E 1, Class "X" with a linear weight: 54.77 kg / m for a length of 18 meters each.

By: Erardo Césari

0 comments:

Post a Comment